Battery Crash/Drop Readiness
De-risk pack architecture against crash, drop, and abuse loading before costly hardware iterations.

Typical timeline: 2-4 weeks for scoped work packages
- Risk-ranked load-case matrix
- Model package with documented assumptions
- Design change recommendations with trade-offs



